|
|image = Xihu Station platform.jpg |caption = The Xihu Station platform |type = Rapid transit |locale = Taipei, Republic of China |start = Songshan Airport |end = Taipei Nangang Exhibition Center |stations = 12 |open = July 4, 2009 |operator = Taipei Rapid Transit System |character = Elevated and underground |depot = Neihu Depot |stock = Bombardier INNOVIA 256, VAL 256 2 cars per set, 2 sets per train |linelength = |notrack = 2 |gauge = 〔內湖線則採用膠輪/鋼軌系統,中心線間距為1,880mm。此外,木柵線因採膠輪/水泥軌道系統,一般來說並無軌距之分,但其凸出於路面的兩條行車水泥軌枕,中心線間距為1,880mm。〕 |speed = |el = Third rail (750 volts DC) |map = }} The Taipei Metro Neihu Line is a medium-capacity rapid transit system and runs on an elevated corridor except near Songshan Airport and Dazhi. The line's service length is and it is joined to the Wenshan Line at Zhongshan Junior High School Station, providing direct service through Neihu, Nangang, and Wenshan. ==Line Overview== The Neihu Line is a Phase 1 Brown Line extension that brought rapid transit into the Neihu District (the last of Taipei's districts to have rapid transit). The line has 12 stations: 10 elevated and 2 underground stations. Construction was completed in late 2008, and trial operations began in early 2009. The line officially began service on July 4, 2009.〔 〕〔http://www.taipeitimes.com/News/taiwan/archives/2008/08/05/2003419476〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Neihu Line (Taipei Metro)」の詳細全文を読む スポンサード リンク
|